Role of FCR
Frequency Containment Reserve (FCR; primary balancing capacity) is the fastest-responding of the five products traded in the Supply and Demand Balancing Market (balancing market; the market in which general transmission and distribution companies, or GT&D companies, procure balancing capacity; see article 1). Trading began in April 2024.
FCR is balancing capacity for frequency control against the “very-short-period component,” demand fluctuation of a few seconds to a few minutes.
Demand fluctuation is divided by period into “very-short-period,” “short-period” and “long-period” components. Of these, the very-short-period component has been handled by generators’ governor-free operation (GF). Governor-free operation is operation in which a generator changes its output automatically in response to changes in grid frequency (article 2). FCR was designed as a product equivalent to this frequency control function provided by governor-free operation.


Role in Normal Conditions (Intra-Period Fluctuation of Demand and Renewables)
Actual demand and renewable output change from moment to moment. Even if forecast and actual values match as 30-minute averages, small fluctuations occur over periods shorter than 30 minutes.
This is called “intra-period fluctuation.” FCR is responsible for adjusting the very-short-period component of this fluctuation.
To handle the very-short-period component, FCR must detect frequency changes locally and change its output immediately based on its droop.
- Local: At the resource’s own terminals. FCR measures frequency where the facility is located and responds by itself. It does not wait for instructions from the center.
- Droop: The slope that shows the relationship between frequency deviation and change in output. A droop of 5% means that when frequency changes by 5% (3 Hz on a 60 Hz system), output changes by 100% of the rated output.
Role in Contingencies
A contingency here means a generator stopping unexpectedly because of a fault or other trouble (generator trip). When a generator trip occurs, supply capacity drops suddenly and frequency falls, which could lead to a large-scale blackout. To prevent this, the lost supply capacity must be made up immediately with balancing capacity.
FCR detects the drop in frequency at the time of a generator trip and immediately raises its output to contain the frequency drop. Because its duration is short, it then hands its role over in turn to Synchronized Frequency Restoration Reserve (S-FRR) and Replacement Reserve (RR) (articles 5 and 7).

Product Requirements
The main requirements of FCR are as follows (Electric Power Reserve eXchange (EPRX), product requirements, 6th edition, March 13, 2026).
| Item | Requirement |
|---|---|
| Instruction and control | Offline (local control) |
| Monitoring | Online (offline also partly allowed; in that case, numerical data are submitted afterward) |
| Communication line | Dedicated communication line only (not needed with offline monitoring) |
| Response time | Within 10 seconds (within 30 seconds with offline monitoring) |
| Duration | 5 minutes or more (not set with offline monitoring) |
| Synchronization | Required (the resource must be connected to the grid during the time slots it provides) |
| Upper limit of available reserve capacity | The amount by which output can be changed within 10 seconds (the GF range based on equipment performance is the upper limit) |
| Bidding time unit and minimum bid | 30 minutes, 1 MW |
Technical requirements are set for the frequency measurement interval, frequency measurement error, dead band (the frequency range within which the resource does not react), droop, and response delay (the time from a frequency change until output starts to change) (Organization for Cross-regional Coordination of Transmission Operators, JAPAN (OCCTO), Subcommittee on the Balancing Market, 28th meeting, Material 3-3, p.4).
Resources planning to participate are checked in a pre-qualification review to confirm that the responses required in normal conditions and in contingencies meet these requirements.


Offline Quota
There is an “offline monitoring” quota (FCR offline quota) that allows participation without a dedicated communication line. With offline monitoring, the response time is within 30 seconds (applied from FY2025; note to the product requirements table in the 57th meeting of the Subcommittee on the Balancing Market, Material 5, p.57). In Japan, the fiscal year runs from April to March. The upper limit of procurement under this quota had been the 3σ-equivalent value of the normal-condition portion, but a policy was presented to lower it from FY2026 (April 2026–March 2027) to the 1σ-equivalent value of the normal-condition portion (Agency for Natural Resources and Energy (ANRE), Working Group on Market Design, 110th meeting, Material 4, p.6).
How the Requirement Is Set
Approach at the Design Stage
The FCR requirement was designed as the sum of the requirement for normal conditions and the requirement for contingencies (OCCTO, Subcommittee on the Balancing Market, 14th meeting, Material 2).
FCR = requirement for normal conditions + requirement for contingencies
- Requirement for normal conditions: The 3σ-equivalent value of the swing in 1- to 10-second measurement data of “residual demand” (demand minus renewables), after removing components with periods longer than 10 minutes
- Requirement for contingencies: For each synchronous system at 50 Hz and at 60 Hz, the capacity of the largest single generating unit, allocated in proportion to each area’s system capacity
The 3σ-equivalent value is a statistically processed maximum. Specifically, it is the 99.87th percentile (if there are 10,000 data points, the 9,987th value from the smallest).

Today: Requirement at 3σ, Market Procurement up to 1σ
From FY2026, the upper limit of the volume procured in the market was aligned to the 1σ-equivalent value. The FCR requirement remains at the 3σ-equivalent. The market procures up to the 1σ-equivalent value, and the remaining “3σ−1σ” is secured through spare-capacity utilization contracts (OCCTO, Study Committee on Regulating and Marginal Supply Capability and Long-Term Supply–Demand Balance Evaluation, 117th meeting, Material 4, p.74). A spare-capacity utilization contract allows the GT&D company to use the spare capacity of resources that are already running (article 3).
For delivery from April 26, 2025, the expected effect of EPPS has been deducted from the contingency requirement in areas that were ready. EPPS is a function of the frequency converters that link 50 Hz and 60 Hz. When frequency falls, it instantly sends power from the healthy area to the faulted area (same, pp.61–62).
In addition, for the three eastern 50 Hz companies (Hokkaido, Tohoku and Tokyo), it was decided to deduct the “demand reduction” from the contingency FCR requirement for delivery from October 1, 2026. Demand reduction is the amount by which the power consumption of loads (demand-side equipment) falls naturally when frequency drops. It is calculated as “frequency characteristic of load × size of frequency drop × system capacity.” In the 60 Hz central and western areas, it is not applied at present because it could fall outside the assumptions on which the design of the system stabilization schemes was based (OCCTO, Subcommittee on the Balancing Market, 62nd meeting, Material 4, p.31 and p.34; 63rd meeting, Material 4, p.9).

Trading Mechanism
| Item | Up to delivery on March 13, 2026 | From delivery on March 14, 2026 |
|---|---|---|
| Trading timing | Week-ahead (bids accepted from Monday 14:00 to Tuesday 14:00 of the previous week, cleared by Tuesday 15:00) | Day-ahead (bids accepted from 11:30 to 14:00, cleared by 15:00) |
| Bidding time unit | 3-hour blocks | 30 minutes |
| Price cap | ¥19.51/ΔkW per 30 minutes | ¥15/ΔkW per 30 minutes (¥10 for delivery from September 1, 2026) |
FCR has been procured cross-regionally since FY2024. Under cross-regional procurement, the GT&D companies of several areas jointly procure balancing capacity across area boundaries. However, operation across DC facilities, including frequency converters, is excluded (OCCTO, Subcommittee on the Balancing Market, 57th meeting, Material 5, p.3). From March 2026, it moved to day-ahead cross-regional procurement.
Changes Since the FY2024 Launch
Continuing Procurement Shortfalls
Since trading began in FY2024, FCR bids have continued to fall short of the procurement volume. As of the first half of FY2025, FCR was still, nationwide, a product with a large gap between procurement volume and bid volume (57th meeting, Material 5, p.11).
After the move to day-ahead trading, OCCTO reported the following (Subcommittee on the Balancing Market, 61st meeting, Material 2, pp.11–12 and p.35).
- The procurement volume changed from the 3σ-equivalent to the 1σ-equivalent. On the other hand, the deduction of unoffered headroom ended, and negotiated contracts for pumped storage were forgone or not concluded in the Hokkaido and Tokyo areas. As a result, the procurement volume did not change greatly before and after the move to day-ahead trading.
- National bid volumes increased, and some improvement was seen in shortfall volumes and shortfall rates. They improved in the Tokyo, Shikoku and Kyushu areas.
- Shortfalls in procurement continued in many areas, starting with the Tohoku area.
- Even after the move to day-ahead trading, a certain shortfall continues in FCR and S-FRR.
For the first half of FY2026 (up to August 31), OCCTO reported that, nationwide, the shortfall rate was high at the start of the fiscal year but some improvement was seen from June. By area, following Hokkaido, Chugoku and Shikoku, shortfall rates also improved in the Chubu and Kyushu areas, while shortfall rates tended to be high in the Tohoku, Tokyo, Hokuriku and Kansai areas (Subcommittee on the Balancing Market, 63rd meeting, Material 4, pp.13–14).

Entry of Batteries
Grid-scale battery storage responds quickly and is a resource well suited to the FCR requirements. Since the FY2024 launch, batteries have actually entered the balancing market. OCCTO reports that after the move to day-ahead trading, awarded volumes of batteries in the combined product tend to increase, and the weighted average awarded price of batteries has fallen. OCCTO gives as reasons that more thermal plants were awarded, creating price competition, or that the lower price cap also lowered the awarded prices of some resources (61st meeting, Material 2, p.29).
Lowering of the Price Cap
On the grounds that if a sufficiently competitive environment did not develop and many trades remained cleared at the price cap, the procurement burden on GT&D companies could grow, the price cap for FCR, S-FRR and the combined product was lowered to ¥15/ΔkW per 30 minutes from delivery on March 14, 2026. After that, a certain amount of clearing near the price cap continued, and it was hard to judge that competition had improved, so the cap became ¥10/ΔkW per 30 minutes for delivery from September 1, 2026 (Subcommittee on the Balancing Market, 62nd meeting, Material 2, pp.15–16).
Out-of-Market Procurement
As an emergency measure against undersubscription, “negotiated contracts for pumped storage,” under which GT&D companies contract directly with pumped-storage hydropower and deduct that amount from the procurement volume, have been introduced area by area (article 10). Article 10 explains why pumped-storage hydropower is used.
Summary
FCR was designed as a product equivalent to the frequency control function of generators’ governor-free operation (GF), and trading began in April 2024.
In normal conditions, it provides frequency control against the very-short-period component, demand fluctuation of a few seconds to a few minutes. In contingencies, it contains the frequency drop caused by a generator trip.
From March 2026, it moved to day-ahead trading in 30-minute units, market procurement was limited to the 1σ-equivalent value, and the price cap became ¥10/ΔkW per 30 minutes from September 2026. Procurement shortfalls have continued since the launch, and the situation is shifting with the entry of batteries, negotiated contracts for pumped storage and the lowering of the price cap. Changes to the rules are summarized in article 1.
This article is based on published materials from the Ministry of Economy, Trade and Industry and its Agency for Natural Resources and Energy, the Electricity and Gas Market Surveillance Commission, the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) and other sources. The English translations of figures are by ENERGY ADVISOR and are not official translations. When using this information for decisions, please check the original sources. When we find an error, we correct the article and note the date of the correction.
Sources
- Electric Power Reserve eXchange (EPRX), “Product Requirements and Trading Schedule of the Supply and Demand Balancing Market (6th edition)” (in Japanese), p.2 and p.3, March 13, 2026. https://www.eprx.or.jp/outline/docs/shouhin_ver.6_20260313.pdf
- OCCTO, Subcommittee on the Balancing Market, 14th meeting, Material 2, “Approach to the Requirements for FCR to RR” (in Japanese), slide numbers 11, 13, 14, 28 and 33 (PDF pages 12, 14, 15, 29 and 34), November 5, 2019. https://www.occto.or.jp/iinkai/chouseiryoku/jukyuchousei/2019/files/jukyu_shijyo_14_02r.pdf
- OCCTO, Subcommittee on the Balancing Market, 28th meeting, Material 3-3 (technical requirements and pre-qualification review for FCR) (in Japanese), p.4 and p.12, February 24, 2022. https://www.occto.or.jp/iinkai/chouseiryoku/jukyuchousei/2021/files/jukyu_shijyo_28_03_03.pdf
- ANRE, Working Group on Market Design, 110th meeting, Material 4, “The Balancing Market” (in Japanese), p.6, January 23, 2026. https://www.meti.go.jp/shingikai/enecho/denryoku_gas/jisedai_kiban/system_review/pdf/110_04_00.pdf
- OCCTO, Study Committee on Regulating and Marginal Supply Capability and Long-Term Supply–Demand Balance Evaluation, 117th meeting, Material 4, “Status of Discussions in the Subcommittee on the Balancing Market (FY2025 Report)” (in Japanese), pp.61–62 and p.74, March 16, 2026. https://www.occto.or.jp/assets/chousei_117_04.pdf
- OCCTO, Subcommittee on the Balancing Market, 57th meeting, Material 5, “Direction and Summary of Discussions in the Subcommittee on the Balancing Market (Results for the First Half of FY2025 and Plans for the Second Half of FY2025)” (in Japanese), p.3, p.11 and p.57, September 26, 2025. https://www.occto.or.jp/assets/iinkai/chouseiryoku/jukyuchousei/2025/files/jukyu_shijyo_57_05.pdf
- OCCTO, Subcommittee on the Balancing Market, 61st meeting, Material 2, “Trading Status of the Balancing Market” (in Japanese), pp.11–12, p.29, p.30 and p.35, June 9, 2026. https://www.occto.or.jp/assets/iinkai/jukyuchousei/61/jukyu_shijyo_61_02.pdf
- OCCTO, Subcommittee on the Balancing Market, 62nd meeting, Material 2, “Results of Fact-Finding Surveys on the Balancing Market” (in Japanese), pp.15–16, July 31, 2026. https://www.occto.or.jp/assets/iinkai/jukyuchousei/62/jukyu_shijyo_62_02.pdf
- OCCTO, Subcommittee on the Balancing Market, 62nd meeting, Material 3, “Review of Some Product Requirements” (in Japanese), p.32, July 31, 2026. https://www.occto.or.jp/assets/iinkai/jukyuchousei/62/jukyu_shijyo_62_03.pdf
- OCCTO, Subcommittee on the Balancing Market, 62nd meeting, Material 4, “Review of FCR (Requirement for Abnormal Conditions)” (in Japanese), p.19, p.31 and p.34, July 31, 2026. https://www.occto.or.jp/assets/iinkai/jukyuchousei/62/jukyu_shijyo_62_04.pdf
- OCCTO, Subcommittee on the Balancing Market, 63rd meeting, Material 4, “Direction and Summary of Discussions in the Subcommittee on the Balancing Market (Results for the First Half of FY2026 and Plans for the Second Half of FY2026 Onward)” (in Japanese), p.9, pp.13–14 and p.49, September 15, 2026. https://www.occto.or.jp/assets/iinkai/jukyuchousei/63/jukyu_shijyo_63_04.pdf