Explainers are grouped by topic. Within each topic, the articles are listed in the order we suggest reading them.
Cross-Regional Interconnection Lines
How the cross-regional interconnection lines that link Japan's ten areas work, how their total transfer capability (the upper limit of what can be sent) is set, planned reinforcements, and their effect on the market.
- Cross-Regional Interconnection Lines in Japan: Ten Facilities Linking Nine Areas, and Fence-Based Management from 2026
- Total Transfer Capability (TTC) of Interconnection Lines: Four Limiting Factors and What Sets the Limit in FY2026
- Transient Stability: How It Limits Interconnection Lines, with the Central-Area AC Loop and Tohoku–Tokyo Examples
- Transmission Margin on Interconnection Lines: Capacity Kept Free Within TTC, and FY2026 Settings
- Implicit Auction: Allocating Interconnection Capacity Through the Day-Ahead Market, and the End of Transitional Measures in March 2026
JEPX and the Imbalance System
How the Japan Electric Power Exchange (JEPX) day-ahead and intraday markets work and how prices move, and how imbalances (gaps between plans and actual results) are settled.
- JEPX Day-Ahead and Intraday Markets: Single-Price Clearing the Day Before and Continuous Trading on the Day (2026 New Systems)
- JEPX Day-Ahead Market Bid Curves: How Prices Are Set, and How to Read Price Spikes and ¥0.01/kWh Periods
- How JEPX Spot Prices Change by Season and Time of Day: Demand, Solar Output and Maintenance Outages
- Imbalance Settlement in Japan: Settling Deviations from Planned-Value Balancing, and Its History from 2000 to 2026
- How Imbalance Prices Are Calculated in Japan: The Marginal kWh Price and the Scarcity Adjustment (After the October 2026 Revision)
- How to Check Imbalance Prices in Japan: Reading the Publication Website’s Prices and Calculation Basis Files (October 2026 Revision)
- Japan’s Imbalance Prices from October 1, 2026: A ¥300 Cap, the Cumulative Price Threshold Mechanism and Zonal Intraday Order Books
- Resolving Imbalances with Balancing Capacity: Supply-Demand Balancing and Upward and Downward Capacity in the Balancing Market Era
- Frequency Control with Balancing Capacity: Governor-Free Operation, LFC, EDC and the Balancing Market Products
Balancing Market and Co-Optimization Market
The five products of the balancing market, in which general transmission and distribution companies procure balancing capacity to keep the frequency stable, and the study of a co-optimization market that clears electricity (kWh) and balancing capacity together.
- Japan’s Balancing Market: Five Products, How to Participate, and the 2026 Move to Day-Ahead Trading
- The Five Products of Japan’s Balancing Market, Explained Through Frequency Control (GF, LFC and EDC)
- From Balancing Capacity Tenders to the Balancing Market: How Type I and Type II Resources Were Replaced (FY2021–FY2024)
- Frequency Containment Reserve (FCR) in Japan: The Fastest Balancing Product and What Changed After FY2024
- Synchronized Frequency Restoration Reserve (S-FRR) in Japan: The LFC-Equivalent Product and Why It Is Last to Go Cross-Regional
- Frequency Restoration Reserve (FRR) in Japan: The EDC-Equivalent Product That Is Not Used for Contingencies
- Replacement Reserve (RR) in Japan: The EDC-Equivalent Product and Its Move from Week-Ahead to Day-Ahead Trading
- Replacement Reserve-for FIT (RR-FIT) in Japan: Covering FIT Renewable Forecast Errors Day-Ahead, and Cutting the Requirement
- The Combined Product in Japan’s Balancing Market: Offering FCR to RR from One Resource, and What Happened After Launch
- Negotiated Contracts for Pumped Storage in Japan: Why Pumped Hydro Is Used Outside the Balancing Market, and the FY2026 Status by Area
Grid Access Rules
Rules for using the transmission and distribution grid, such as non-firm connection, redispatch, congestion management in local grids and the connection of grid-scale batteries.
- Non-Firm Connection in Japan: Non-Firm by Default Since 2023, and Congestion Curtailment Now in Practice
- N-1 Generation Tripping in Japan: Mechanism, Full Application (July 2022) and Cost Settlement Results
- Redispatch in Japan: From Using Balancing Resources to the Fixed Curtailment Order and Expansion to Local Grids
- Congestion Management on Local Transmission Systems in Japan: From Pro-Rata Curtailment of Non-Firm Generators to the Fixed Curtailment Order (2023–2026)
- Grid Congestion Data for Siting Renewables and Grid-Scale Batteries in Japan: Types of Published Information and How to Read the FY2031 Outlook
- Early Connection Rules for Grid-Scale Battery Storage in Japan: The N-1 Charging-Stop Scheme and the Charging Restriction (from April 2025)
- Non-Firm Grid-Scale Batteries and Japan’s Balancing Market: Eligibility Period and Treatment of Awarded ΔkW during Congestion
Capacity Market and Long-Term Decarbonized Capacity Auction
The capacity market, which secures the supply capacity needed four years ahead, and the Long-Term Decarbonized Capacity Auction, which promises decarbonized resources fixed-cost-level revenue for, in principle, 20 years.
- Japan’s Capacity Market: Background, Purpose and Results Since Delivery Began
- Japan’s Capacity Market Cycle: From the Auction Four Years Ahead to Delivery and Capacity Contributions
- Japan’s Capacity Market Main Auction: Mechanism and Results of Six Auctions (Delivery Years FY2024–FY2029)
- Dispatch-on-Command Resources in Japan’s Capacity Market: Effectiveness Tests, Dispatch Calls and Adjustment Coefficients
- Capacity Contributions in Japan: Calculation, Totals and the Long-Term Decarbonized Capacity Auction Add-On
- Japan’s Long-Term Decarbonized Capacity Auction: Background, Purpose and Results of Three Rounds
- Japan’s Long-Term Decarbonized Capacity Auction: Eligible Resources, Procurement Targets and Results of Three Rounds
- Prices and Revenue in Japan’s Long-Term Decarbonized Capacity Auction: Price Caps, Winning Prices and Refunds
GX-ETS and Non-Fossil Certificates
How the GX Emissions Trading System (GX-ETS), which started in FY2026, works and how its prices are set, and the types, markets and prices of non-fossil certificates.
- Overview of the GX-ETS, Japan’s Emissions Trading System
- GX-ETS Covered Companies and Calculation Rules (MRV)
- GX-ETS Emission Allowances: Allocation, Trading and Surrender
- GX-ETS Allowance Prices: Price Stabilization Mechanism and Market Mechanism
- The Tokyo Stock Exchange Carbon Credit Market and the GX-ETS Trading Market
- Types and Uses of Carbon Credits: J-Credits, JCM and Eligible Credits
- How Japan’s Carbon Levy Works and How It Differs from the GX-ETS
- Impact of the GX-ETS on the Power Industry: Responses of Generators and Retailers
- EU-ETS and GX-ETS: A Comparison of the Systems and Lessons for Japan
- Overview of Non-Fossil Value and the Three Types of Non-Fossil Certificates
- The Sophisticated Methods Act: How Interim Targets Are Set in Phase 3 (FY2026–FY2028)
- How Japan’s FIT and FIP Schemes Relate to Non-Fossil Certificates
- FIT Non-Fossil Certificates: Mechanism, Prices and How to Buy (FY2026)
- Non-FIT Non-Fossil Certificates: Renewable-Designated vs. Non-Designated
- Tracking and Full Tracking of Non-Fossil Certificates
- Japan’s Two Non-Fossil Value Markets: Renewable Energy Value Trading and Sophisticated Methods Act Compliance
- Non-Fossil Certificate Prices: Why FIT Certificates Stick at the Floor and Non-FIT at the Cap
- Corporate PPAs and Non-Fossil Certificates: Ownership of Environmental Attributes
- Retail Electricity Suppliers and Non-Fossil Certificates: Phase 3 Interim Targets and Procurement in Practice
- Comparing Non-Fossil Certificates, J-Credits, Green Power Certificates and Other Environmental Attributes
- Non-Fossil Certificates and the GX-ETS: Where Certificates Stand in Japan’s Emissions Trading System
High-Voltage Electricity Prices
What makes up Japan's high-voltage (6.6 kV) electricity prices, fuel cost adjustment and market-linked prices, and how to compare quotations.
- Part 1: Why High-Voltage and Extra-High-Voltage Electricity Prices Are Hard to Compare (Overview)
- Part 3: Fuel Cost Adjustment Moves to a One-Month Average (April 2026) and the Effect on Bills
- Part 4: Standard Tariffs: The Only Published Price Benchmark for High-Voltage Supply
- Part 5: How Market-Linked Plans Work and Their Risks: What to Check Before Signing
- Part 6: How to Read a High-Voltage Electricity Bill: Six Components, and When Government Bill Relief Applies
- Part 7: Capacity Contributions: A Cost for Future Supply Capacity Borne by Retail Electricity Suppliers and Others Since FY2024
- Part 8: How Contract Demand Is Set: 30-Minute Demand Under the Actual-Demand Method and the Demand Charge
- Part 9: Checking High-Voltage Quotations: Five Points for Comparison
- Part 10: What Changed When the Former Standard Tariffs Ended (March 2026): Consolidation into the Three Current Plans
- Part 11: Comparing by Applying Past Actual Usage: How It Differs from Forward-Looking Simulation
- Part 12: Market Exit and Bankruptcy Risk of New Entrant Retailers: How to Assess a Supplier Before Switching
- Part 13: Consider Electricity Cost Review and Decarbonization Together: Responding to Customers’ Renewable Energy Requests
- Part 14: When and How to Review an Electricity Contract: Renewal Timing and Internal Steps
- Special Edition: Differences in High-Voltage Standard Plans by Area: A Component-by-Component Guide to Nine Utilities
Decarbonization for SMEs
For small and medium-sized enterprises asked by customers to report CO2 emissions: how to count emissions, how to reduce them and what support is available.
- Part 1: How Supply Chain Decarbonization Works — Why Customers Ask SMEs to Report CO2 Emissions
- Part 2: Scope 1, 2 and 3 and the Carbon Footprint of Products (CFP) — Company-Wide CO2 vs. CO2 per Product
- Part 3: The Schemes Behind the Requests — SBT, CDP and GX-ETS, and How They Differ from Legal Reporting Obligations
- Part 4: Calculating Scope 2 in Practice — CO2 Emissions from Electricity Consumption
- Part 5: Understanding Japan’s Emission Factor System — Basic, Adjusted and Menu-Specific Factors and the Residual Mix
- Part 6: Calculating Scope 1 and Free or Low-Cost Public Support — Taking Stock of Fuels and an Overview of Tools
- Part 7: The Order of Reductions — Operational Improvements, Contract Review and Capital Investment
- Part 8: Electricity Contracts and CO2 — How Reviewing Your Contract and Tariff Plan Affects Emissions and Costs
- Part 9: Four Ways to Procure Renewable Energy — Renewable Plans, Non-Fossil Certificates, PPAs and Self-Consumption
- Part 10: Self-Consumption Solar PV and Batteries — How to Calculate the Economics and Their Value Against Power Outages
- Part 11: A Map of Energy and Decarbonization Subsidies for SMEs in Japan (FY2026, October Update)
- Part 12: The Annual Cycle of Decarbonization Work: Calculation, Reporting, Customer Questionnaires and Subsidy Calls
- Extra: Subsidies for Solar PV and Batteries: The Storage Parity Project Explained (with FY2026 Calls)
- Extra: Subsidies for Energy-Saving Equipment: The SII Subsidy for Energy Conservation and Non-fossil Transition (FY2026, 1st–4th Calls)
- Extra: Subsidies for Drawing Up Reduction Plans: The SHIFT Program Explained (FY2026, First to Third Calls)
- Extra: Subsidy Applications and the Gyoseishoshi Act: What Changed with the January 2026 Amendment
- Extra: Standard Energy-Saving Measures and How to Read Public Energy Audit Cases: Air Conditioning, Compressors and Lighting
- Extra: CDP Questionnaire Basics: Patterns in the Questions That Arrive through Customers
- Extra: SME Decarbonization in Japan: 20 Frequently Asked Questions
- Extra: Glossary of Key Terms for SMEs and Decarbonization in Japan