Role of FRR

Frequency Restoration Reserve (FRR; secondary balancing capacity (2)) is one of the five products of the Supply and Demand Balancing Market (balancing market; the market in which general transmission and distribution companies, or GT&D companies, procure balancing capacity; see article 1). Trading began in April 2024.

FRR is balancing capacity against the “long-period component,” demand fluctuation of around ten-plus minutes to several hours.

Demand fluctuation is divided by period into “very-short-period,” “short-period” and “long-period” components. Of these, the long-period component has been handled by economic load dispatching control (EDC). EDC is a function in which each area’s central load dispatching center (the GT&D company’s control room) forecasts demand changes from around ten-plus minutes to several hours ahead and allocates output so that generation cost for the whole area is minimized (article 2). FRR was designed as a product equivalent to this control function provided by EDC.

Demand changing from moment to moment, broken down into very-short-, short- and long-period components
Figure 1: Demand changing from moment to moment, broken down into very-short-, short- and long-period components
EDC as one of generators' frequency control functions
Figure 2: EDC as one of generators' frequency control functions

Role in Normal Conditions (Responding to Forecast Errors of Demand and Renewables)

Demand Forecast Error

Actual demand and renewable output change from moment to moment.

Retail electricity suppliers forecast their own demand in 30-minute units and prepare a “balancing group schedule.” A balancing group (BG) is a group of companies responsible for matching actual results to plans. Because no BG schedule can match actual demand exactly, a difference between forecast and actual arises after gate closure (GC; the deadline for plans one hour before real time).

This is called “forecast error.” FRR is responsible for adjusting this forecast error between the BG schedule and actual demand.

Residual demand after GC, forecast error and the BG schedule
Figure 3: Residual demand after GC, forecast error and the BG schedule

Renewable Forecast Error

Forecast errors arise not only in demand but also in renewable forecasts.

In forecasts made under FIT special system (1) and (3) (the arrangements under which GT&D companies forecast renewable output), forecast error also arises between the forecast value at GC and the actual value. FRR also responds to this renewable forecast error after GC.

Why It Has No Role in Contingencies

A contingency here means a generator stopping unexpectedly because of a fault or other trouble (generator trip). When a generator trip occurs, supply capacity drops suddenly and frequency falls, which could lead to a large-scale blackout. The lost supply capacity therefore needs to be made up immediately with balancing capacity.

FRR does not respond to frequency drops caused by generator trips.

Synchronized Frequency Restoration Reserve (S-FRR; secondary balancing capacity (1)) and FRR have the same response time and duration. The difference is that for FRR, synchronization to the grid (being connected to the grid and running) is optional. Because it is hard to prepare for contingencies that can occur at any time with resources that may not be synchronized, FRR has not been given a role in contingencies. The rule is that contingencies are handled by Frequency Containment Reserve (FCR; primary), S-FRR and Replacement Reserve (RR; tertiary (1)).

Product Requirements

The main requirements of FRR are as follows (Electric Power Reserve eXchange (EPRX), product requirements, 6th edition, March 13, 2026).

Item Requirement
Instruction and control Online (EDC signal)
Communication line Dedicated communication line or simplified dispatch system
Response time Within 5 minutes
Duration 30 minutes
Synchronization Optional
Instruction interval Dedicated line: a few seconds to a few minutes / simplified dispatch system: 5 minutes
Monitoring interval Dedicated line: about 1 to 5 seconds / simplified dispatch system: 1 minute
Bidding time unit and minimum bid 30 minutes, 1 MW

The simplified dispatch system is a communication method other than a dedicated communication line (instruction interval 5 minutes, monitoring interval 1 minute; product requirements, 6th edition, p.2).

FRR does not have technical requirements (dead band, response delay, etc.) like those for FCR and S-FRR. Because its product requirements are the same as those for RR except for response time and duration, it was decided not to set technical requirements, in the same way as for RR (Organization for Cross-regional Coordination of Transmission Operators, JAPAN (OCCTO), Subcommittee on the Balancing Market, 28th meeting, Material 3-3, p.33).

How the Requirement Is Set

Approach at the Design Stage

The FRR requirement was designed using only the requirement for normal conditions (OCCTO, Subcommittee on the Balancing Market, 14th meeting, Material 2).

FRR = requirement for normal conditions
Requirement for normal conditions = 3σ-equivalent value of (the period-to-period change in the 30-minute average of residual demand forecast error)

  • 30-minute average of residual demand forecast error: the 30-minute average of 30-second measurement data of residual demand (demand minus renewables) − (BG demand plan − renewable forecast at GC)
  • 3σ-equivalent value: a statistically processed maximum. Specifically, the 99.87th percentile (if there are 10,000 data points, the 9,987th value from the smallest)

The long-period component of demand includes, in addition to demand forecast error, changes that BGs make to their own generation plans to comply with planned-value balancing. The GT&D company therefore adjusts the “forecast error” part, which is the long-period component minus the part due to BG schedules.

That forecast error is shared between FRR and RR according to their response speed. FRR, which responds quickly, adjusts the change in forecast error between one 30-minute period and the next. From the next period onward, it hands over to RR, which responds more slowly but has a longer duration, and FRR gets ready for the next adjustment. This division of roles is explained in detail in article 7 (RR).

Separating the long-period component, and the division of roles between FRR and RR
Figure 4: Separating the long-period component, and the division of roles between FRR and RR

In the 2019 trial calculation at the design stage, the FRR requirement in the TEPCO Power Grid area was from the 1% range to about 5% of each month’s H3 demand (for each month, the average of the three highest daily peak demands), depending on the time of day (14th meeting, Material 2, slide 73, PDF page 74). This was a trial calculation at the time based on week-ahead trading and 3-hour blocks, and differs from today’s procurement volume.

Trial calculation of FRR for the TEPCO Power Grid area (2019 trial calculation, as a ratio to H3 demand)
Figure 5: Trial calculation of FRR for the TEPCO Power Grid area (2019 trial calculation, as a ratio to H3 demand)

Treatment from FY2026

From FY2026 (April 2026–March 2027), the requirement changes according to how much supply margin there is (OCCTO, Study Committee on Regulating and Marginal Supply Capability and Long-Term Supply–Demand Balance Evaluation, 117th meeting, Material 4, p.22 and p.74). In Japan, the fiscal year runs from April to March. The 10% threshold was set by examining the relationship between the cross-regional reserve margin and actual imbalances (deviations between plans and results). It was decided based on results for the first half of FY2025, and a later recalculation that added second-half results up to mid-February 2026 also gave about 10%. A review is to be considered depending on future operation (same, p.22).

Cross-regional reserve margin in the plan for two days ahead FRR requirement Volume procured in the market Volume secured through spare-capacity utilization contracts
10% or more 1σ 1σ —
Below 10% 3σ 1σ 3σ−1σ

The cross-regional reserve margin is an indicator published by OCCTO that shows how much supply capacity exceeds demand. A spare-capacity utilization contract is a contract under which the GT&D company uses the spare capacity of resources already running (article 3). Any shortfall in the market is added to the volume secured from spare capacity.

Scatter plot of the cross-regional reserve margin and the imbalance rate used to set the 10% threshold for the combined product requirement
Figure 6: Scatter plot of the cross-regional reserve margin and the imbalance rate used to set the 10% threshold for the combined product requirement
How the requirement is secured after the move to day-ahead trading: requirement (1σ, 3σ) and where it is secured, by product including FRR
Figure 7: How the requirement is secured after the move to day-ahead trading: requirement (1σ, 3σ) and where it is secured, by product including FRR

Trading Mechanism

Item Up to delivery on March 13, 2026 From delivery on March 14, 2026
Trading timing Week-ahead (bids accepted from Monday 14:00 to Tuesday 14:00 of the previous week, cleared by Tuesday 15:00) Day-ahead (bids accepted from 11:30 to 14:00, cleared by 15:00)
Bidding time unit 3-hour blocks 30 minutes

FRR has used “cross-regional procurement,” in which several areas procure jointly, since FY2024. From March 2026, it moved to day-ahead cross-regional procurement (OCCTO, Subcommittee on the Balancing Market, 57th meeting, Material 5, p.3).

The products listed in the materials as subject to the lowering of the price cap (to ¥15 in March 2026 and ¥10/ΔkW per 30 minutes in September) are FCR, S-FRR and the combined product (Subcommittee on the Balancing Market, 62nd meeting, Material 2, pp.15–16).

On FRR after the move to day-ahead trading, OCCTO reported the following (Subcommittee on the Balancing Market, 61st meeting, Material 2, pp.15–16).

  • The deduction of unoffered headroom ended, and negotiated contracts for pumped storage were forgone or not concluded in the Hokkaido and Tokyo areas, so the procurement volume increased after the move to day-ahead trading.
  • National bid volumes increased, but in some time slots bid volumes did not reach the procurement volume, and the shortfall rate rose.
  • Bid volumes increased in the Tokyo and Chubu areas, while days with shortfalls were seen in the Tohoku, Hokuriku, Kansai and Chugoku areas.

For the first half of FY2026 (up to August 31), OCCTO reported that national bid volumes increased, and that the shortfall rate was high at the start of the fiscal year but some improvement was seen from June. By area, shortfall rates were high in the Chubu, Hokuriku and Kansai areas, and the other areas mostly met their procurement volumes (Subcommittee on the Balancing Market, 63rd meeting, Material 4, pp.17–18).

FRR procurement volume, bid volume and shortfall rate, April to August 2026
Figure 8: FRR procurement volume, bid volume and shortfall rate, April to August 2026

Summary

FRR was designed as a product equivalent to the control function of economic load dispatching control (EDC), and trading began in April 2024.

In normal conditions, it adjusts the period-to-period change between 30-minute periods in the “forecast error,” which is the long-period component of demand minus the part due to BG schedules.

Because synchronization to the grid is optional, it is not suited to preparing for contingencies that can occur at any time, and it has not been given a role in contingencies.

From March 2026, it moved to day-ahead trading in 30-minute units. The requirement is 1σ or 3σ depending on the cross-regional reserve margin in the plan for two days ahead, and market procurement is up to the 1σ-equivalent value.

This article is based on published materials from the Ministry of Economy, Trade and Industry and its Agency for Natural Resources and Energy, the Electricity and Gas Market Surveillance Commission, the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) and other sources. The English translations of figures are by ENERGY ADVISOR and are not official translations. When using this information for decisions, please check the original sources. When we find an error, we correct the article and note the date of the correction.

Sources

  • Electric Power Reserve eXchange (EPRX), “Product Requirements and Trading Schedule of the Supply and Demand Balancing Market (6th edition)” (in Japanese), p.2 and p.3, March 13, 2026. https://www.eprx.or.jp/outline/docs/shouhin_ver.6_20260313.pdf
  • OCCTO, Subcommittee on the Balancing Market, 14th meeting, Material 2, “Approach to the Requirements for FCR to RR” (in Japanese), slide numbers 13, 14, 25–27 and 73 (PDF pages 14, 15, 26–28 and 74), November 5, 2019. https://www.occto.or.jp/iinkai/chouseiryoku/jukyuchousei/2019/files/jukyu_shijyo_14_02r.pdf
  • OCCTO, Study Committee on Regulating and Marginal Supply Capability and Long-Term Supply–Demand Balance Evaluation, 117th meeting, Material 4, “Status of Discussions in the Subcommittee on the Balancing Market (FY2025 Report)” (in Japanese), p.22 and p.74, March 16, 2026. https://www.occto.or.jp/assets/chousei_117_04.pdf
  • OCCTO, Subcommittee on the Balancing Market, 57th meeting, Material 5, “Direction and Summary of Discussions in the Subcommittee on the Balancing Market (Results for the First Half of FY2025 and Plans for the Second Half of FY2025)” (in Japanese), p.3, September 26, 2025. https://www.occto.or.jp/assets/iinkai/chouseiryoku/jukyuchousei/2025/files/jukyu_shijyo_57_05.pdf
  • OCCTO, Subcommittee on the Balancing Market, 61st meeting, Material 2, “Trading Status of the Balancing Market” (in Japanese), pp.15–16, June 9, 2026. https://www.occto.or.jp/assets/iinkai/jukyuchousei/61/jukyu_shijyo_61_02.pdf
  • OCCTO, Subcommittee on the Balancing Market, 63rd meeting, Material 4, “Direction and Summary of Discussions in the Subcommittee on the Balancing Market (Results for the First Half of FY2026 and Plans for the Second Half of FY2026 Onward)” (in Japanese), pp.17–18, September 15, 2026. https://www.occto.or.jp/assets/iinkai/jukyuchousei/63/jukyu_shijyo_63_04.pdf
  • OCCTO, Subcommittee on the Balancing Market, 28th meeting, Material 3-3 (in Japanese), p.33 (technical requirements for FRR), February 24, 2022. https://www.occto.or.jp/iinkai/chouseiryoku/jukyuchousei/2021/files/jukyu_shijyo_28_03_03.pdf
  • OCCTO, Subcommittee on the Balancing Market, 62nd meeting, Material 2, “Results of Fact-Finding Surveys on the Balancing Market” (in Japanese), pp.15–16, July 31, 2026. https://www.occto.or.jp/assets/iinkai/jukyuchousei/62/jukyu_shijyo_62_02.pdf